Production: Update to export file from RamBase to Rob_Ex planner
K
Knut Sætre Waka
started a topic
7 months ago
Classification: USEFUL
We have made an enhancement to the XML-file export from RamBase to Rob_Ex by providing additional material status information.
The matCal field in the operation <Opr> tag gives the last expected availability date for the material/parts required for an operation. It is based on the last confirmed date or if one or more links are unconfirmed, and in that case the date will be based on purchase lead time.
We have now added a material status indication in the custText1 field in the operation <Opr> tag. This field will now display the current status of material for each operation.
PENDING - If one or more material lines for the operation is not purchase (linked to ‘pending’):
New field ‘custText1’=PENDING.
UNCONFIRMED - If no ‘pending’ link, but one or more material lines for the operation linked to not confirmed purchase order or not confirmed production work order:
New field ‘custText1’=UNCONFIRMED.
CONFIRMED - If no material lines for the operation get match from 1 (PENDING) or 2 (UNCONFIRMED), all is confirmed or linked to stock:
Knut Sætre Waka
Classification: USEFUL
We have made an enhancement to the XML-file export from RamBase to Rob_Ex by providing additional material status information.
The matCal field in the operation <Opr> tag gives the last expected availability date for the material/parts required for an operation. It is based on the last confirmed date or if one or more links are unconfirmed, and in that case the date will be based on purchase lead time.
We have now added a material status indication in the custText1 field in the operation <Opr> tag. This field will now display the current status of material for each operation.
PENDING - If one or more material lines for the operation is not purchase (linked to ‘pending’):
New field ‘custText1’=PENDING.
UNCONFIRMED - If no ‘pending’ link, but one or more material lines for the operation linked to not confirmed purchase order or not confirmed production work order:
New field ‘custText1’=UNCONFIRMED.
CONFIRMED - If no material lines for the operation get match from 1 (PENDING) or 2 (UNCONFIRMED), all is confirmed or linked to stock:
New field ‘custText1’=Confirmed.
Planned release date: 10 September 2024