The Delink function is designed for manual handling of first to delink and then to relink material in a production order (PWO). ‘Delink production order’ puts all links to status = 1 so they are not listed in the purchase program (PUR) and they are not handled by the optimize job. One can then link manually or use the option: ‘Relink production order’ to activate the links again.