We have 2 reports that will list the hours used on a production work order (PWO):


NGREP/102259 Production Operation Work Log List

This report presents the worklog for the production work order (PWO) operations in WOO.

NGREP/103583 Production Operation Work Log List With Corrections

This report presents production order (PWO) worklog elements (WOO) where the element has been corrected.


See description on the reports for tips on how to filter:)